Handbook / Pricing your work
How to quote a job: estimate time, costs and risk, then present it well
A good quote wins work at a price that pays you properly. A bad one either loses the job or wins it at a loss. Quoting well is a skill: understanding the job, estimating honestly, adding what you need to stay in business, and presenting it so the client can say yes.
1. Understand the job
Ask questions before you put a number on anything:
- What exactly needs to be done, and what does "done" look like?
- What is the deadline, and is it fixed?
- What will the client provide, such as access, materials or content?
- Are there constraints, such as working hours, site access or approvals?
- Who makes the decision, and what is their budget range?
For physical work, a site visit or photos help. For creative or professional work, a discovery call and a short questionnaire do the same.
2. Break it into tasks
List every stage of the work: preparation, travel, the main tasks, revisions or rework, clean-up, admin and handover. Small tasks add up and are the first to be forgotten.
3. Estimate time
Estimate hours for each task based on similar past jobs. If you have no history, estimate generously and track actual time. Comparing estimated and actual hours after every job is the single best way to improve your quoting.
4. Estimate materials and costs
Include:
- materials and supplies, with any waste allowance
- equipment hire
- subcontractors
- travel, parking and delivery
- permits or fees
- software or stock assets bought for the job
5. Add overhead and profit
Your price must cover more than the job's direct costs. Overhead includes insurance, tools, vehicle, software, marketing, accounting and unpaid admin time. Spreading those costs over your billable hours gives you an hourly cost; see hourly rate. Remember that self-employment tax and income tax come out of what you earn, so a price that only covers costs leaves you short.
Then add a profit margin. Profit is what lets the business build reserves, invest and survive slow periods.
6. Add contingency for uncertainty
Jobs with unknowns, such as old buildings, unclear requirements or new types of work, deserve a contingency. Either build it into the price, state an allowance for specific risks, or price the work in stages: a paid first phase that answers the unknowns, then a quote for the rest.
7. Check against the market
Compare your total with what similar businesses charge and with the value to the client. If your price is far above the market, look for ways to reduce scope or explain the difference. If it is far below, you may be underpricing. See how to price services.
8. Write the quote
A clear written quote includes:
- your business name and contact details
- client name and job reference
- scope: what is included, in plain language
- exclusions: what is not included
- assumptions: for example, access or materials provided by the client
- timeline
- price, with any options listed separately
- payment terms, including any deposit
- expiry date for the quote
- how to accept
For larger projects, a statement of work or contract should follow. An agreement generally becomes binding when both sides exchange something of value, so make sure the accepted quote matches the work you plan to do.
9. Present and follow up
Send the quote promptly, while the client is still interested. Offer a short call to walk through it. If you have not heard back in a few days, follow up politely; see following up with a client.
Offering options
Two or three options, such as basic, standard and premium, let clients choose the level of service rather than whether to hire you. Keep each option clearly defined.
When the job changes
If the client asks for extra work after accepting, quote the change separately before doing it. The guide to scope creep has wording.
Learning from lost quotes
When a client says no, ask politely why. Price, timing, scope or fit all tell you something. Keep a simple record of quotes won and lost, with the reasons, and review it every few months.
Understand the job, break it into tasks, estimate time and materials honestly, add overhead, contingency and profit, write a clear quote with exclusions and an expiry date, and track actual against estimate.
Questions people ask
What is the difference between an estimate and a quote?
People use the words differently. Often an estimate is approximate while a quote is a fixed price for defined work. Say clearly which you are giving.
How much contingency should I add?
It depends on the uncertainty. Familiar, well-defined jobs need little; new or unclear work needs more, or should be priced in stages.
Should I charge for quotes?
For simple jobs, quotes are usually free. For complex work requiring site visits, design or detailed planning, many businesses charge a fee credited against the job.
How long should a quote be valid?
Long enough for the client to decide, but short enough to protect you from changing costs. State the expiry date on the quote.
Do this week
- Create a quote checklist of questions to ask every client.
- Build a simple estimate spreadsheet with tasks, hours and materials.
- Calculate your hourly cost including overhead.
- Write a quote template with scope, exclusions, terms and expiry date.
- Track estimated versus actual hours on every job.
Sources read for this page
- SBA: manage your finances
- LII Wex: consideration
- IRS: self-employment tax (Social Security and Medicare taxes)
Published November 8, 2026. Sources checked November 8, 2026. Rules, limits and forms change; the linked page is the authority.